
To finish off the CORRAPOL-BT roofing system, install the bitumen ridge using nail or screw fixings every two corrugation peaks. Ensure you overlap the CORRAPOL-BT roof ridge panels by the minimum of 22cm.
Applications
- Sheds
- Garages
- Log stores
- Children’s playhouses
- Chicken pen covered areas
- Residential bicycle covered areas
- Covered walk ways